Besides the usual spring weather related issues, the following are of interest.
· The Waingongoro Swingbridge (on the Waingongoro Track) is closed for replacement. An exact opening date is yet to be determined - and reliant on weather conditions. Track detours are marked. For updated information contact the North Egmont Visitor Centre.
· Pouakai Circuit: New structures have been installed along the Kaiauai Track
· The Stony River fine weather route from the Kapoaiaia Track junction downstream is not advisable during spring, due to erosion.
· The Waiwhakaiho Track has reopened.
·
· Whitecliffs Walkway: This walkway closes from 1 July to 30 September for lambing. The Te Horo Stock Tunnel remains closed. A section of
· Everett Park: Foot access only. Vehicle access to the park is closed until further notice.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.